CHP/CCHP Application


Power Generation & Cogeneration Professional Manufacturer
COMBINED HEAT & POWER (CHP/CCHP)
Whether it is continuous, standby or prime power,
power generation or combined heat and power production (CHP),
PowerLink gas generator sets are effective,
dependable and configured to meet your exact requirement.

10kw-2000kw

CHP/CCHP Application


PowerLink gas-powered generator sets provide you with a continuous, economical, reliable, and sustainable source of power, which utilises natural gas, biogas, and other gas, and features cutting-edge technology that provides combined heat and power (CHP), as well as combined heat, power and cooling (CCHP) solutions. Combined Heat & Power is a gas-fuelled reciprocating piston engine, which drives an alternator to generate electricity. The heat from the CHP engine is then recovered and made available as hot water or steam, which then gives the best efficiency from the use of the fuel consumed and provides low-cost power and heat energy to the client. All our gas cogeneration units combine the highest performance with the lowest emissions in the 20kw– 2mw electrical power range.

Renewable-Energy-solution-biogas cogeneration GXC100S-BG

 

Reduce bills

Can produce complementary energy to save energy cost and reduce heat and electricity bills

 

 

Power security

Avoid power interruptions by seamlessly switching to alternative energy sources

 

 

Energy efficiency

The ability to fulfill environmental initiatives and make full use of energy to improve efficiency

 

 

Clean energy

The ability to modulate down to 50% of the maximum electrical output

 

 

Emissions reduction

Reduce your carbon footprint with renewable energy sources and/or battery storage.

Combined Heat & Power Applications

We not only deliver and install premium CHP products but also work with you to review your facility’s power usage, provide you with the best CHP unit possible, and ensure that it is fully integrated into the infrastructure of your company. We offer CHP units from 20kW to 2MW in both Low voltage and High voltage.

PowerLink Natural Gas Cogeneration hotel
Our CHP units can be used to power leisure facilities, from swimming pools to gym equipment.
PowerLink Natural Gas Cogeneration hospital
With a CHP unit providing power and heat, a hotel’s running costs can drastically reduce.
PowerLink-food-factory-CHP-solution Combined Heat & Power Systems PowerLink food factory CHP solution Green Energy
Food factories can benefit from a CHP unit, thanks to the heat and power the machine provides.
Combined Heat & Power Systems PowerLink hotel CHP solution
We have provided CHP units for hospitals around the world.
Natural-Gas-Cogeneration unit box powerlink
Natural Gas Cogeneration unit box powerlink

Powerlink CHP/CCHP applications

Solutions :

200kw Combined Heat & Power Solution for hotel

1.8MW BIOGAS CHP SYSTEM ENGINEERING PROJECT

1.8MW BIOGAS CHP SYSTEM ENGINEERING PROJECT

  • Location: China
  • Equipment: 3*CG600-BG Gas Genset
  • Electric output mode: Low voltage to grid
  • Field / fuel: Waste Centre / Waste Landfill Biogas
  • Total output power: 1.8MW
400KW NATURAL GAS POWER GENERATION PROJECT

400KW NATURAL GAS POWER GENERATION PROJECT

  • Location: Europe
  • Equipment: CG400-NG Natural Gas Genset
  • Electric output mode: Low voltage to grid
  • Field / fuel: Boiler House for residentials
  • Total output power: 400KWe/460kWt
250KW BIOGAS POWER GENERATION PROJECT

250KW BIOGAS POWER GENERATION PROJECT

  • Location: United Kingdom
  • Equipment: GXE250-BG
  • Electric output mode: Low voltage to grid
  • Field / fuel: Landfill Site / Biogas
  • Total output power: 250KWe
250KW NATURAL GAS COGENERATION HOTEL PROJECT

250KW NATURAL GAS COGENERATION HOTEL PROJECT

  • Location: Europe
  • Equipment: CG250S-NG Natural Gas Genset Soundproof
  • Electric output mode: Low voltage to grid
  • Field / fuel: Hotel
  • Total output power: 250KWe/330KWt
2MW BIOGAS POWER GENERATION PROJECT

2MW BIOGAS POWER GENERATION PROJECT

  • Location: China
  • Equipment: 2x CG1000S-BG Gas Generator Container
  • Electric output mode: Low voltage to grid
  • Field / fuel: Livestock Manure / Biogas
  • Total output power: 2MWel
75KW BIOGAS POWER GENERATION PROJECT

75KW BIOGAS POWER GENERATION PROJECT

  • Location: Brazil
  • Equipment: 1xGXC75C-BG Biogas Genset
  • Electric output mode: Low voltage to grid
  • Field / fuel: Agricultural And Animal Husbandry / Biogas
  • Total output power: 75KW
Biogas-Cogeneration-Project-photo-CHP-units-

>> Project Engineering

We are able to engineer a full gas project for our customers, covering the designing, fabrication and delivery of the units, as well as creating a service plan for the generator.

TGE800-NG-800kw gas genset service and support

>> After Sales Service

At PowerLink, we provide all our customers with a comprehensive aftersales service worldwide, allowing customers to have peace of mind when using our generators.

Parts-support-Accessories-PowerLink-Service

>> Accessories Support

PowerLink has parts warehouses in Europe, Asia, America, and Oceania, with a sufficient level of stock at each warehouse to provide customers with original parts when needed.

Service Applications


The provision of high-quality associated services for Powerlink gas generator is the main factor driving the long-term cooperation between PowerLink and our customers. PowerLink offers its customers a full package of services associated with repair and technical support of its own and third-party equipment.

COMMISSIONING

High-quality and competent equipment installation, start-up and run-in is a ticket to its continuous failure-free operation. The commissioning package enables the customer to obtain a facility fully prepared for operation.

PILOT OPERATION

PowerLink carries out pilot operation of its new solutions at customer enterprises as part of joint projects.

REGULAR EQUIPMENT MAINTENANCE

Periodic equipment inspection and diagnostics as well as technical consultations with the customer, help prevent any problems or interruptions of power with our generators. PowerLink specialists can perform maintenance and repair at a time convenient for the customer regarding problems with their gas generators, or affiliate equipment.

EQUIPMENT OVERHAUL AND REPAIR

At PowerLink, our available production potential allows our team to perform repairs of any complexity within the customer’s agreed timelines on their purchased generator. OEM parts, consumable materials, and their analogs are delivered from our central warehouse in Shanghai, China, but PowerLink offers spare parts and consumable materials for all products to customers all over the world.

UPGRADING

PowerLink upgrades the previously supplied own- and third-party equipment at a customer’s site upon request. The aim of such upgrading is normally to aid in increasing the capacity of the existing system and improvement of the equipment control, which in turn simplifies the plant operator’s duties and signal transmission to the upper-level automatic control system.

PERSONNEL TRAINING

Upon request, the customer may have its personnel properly trained by our team to ensure further adequate operation of the equipment supplied by PowerLink. This training programme can take place at both the customer’s site and in the PowerLink training centre.

CONTACT US TODAY

Have any questions about our products, becoming a partner or how we can help with your gas projects?

Speak with our team today by pressing the link below.

LET`S TALK