Project Cases


Power Generation & Cogeneration Professional Manufacturer

PROJECT ENGINEERING

PowerLink has successfully delivered around 125,000 generators into to users in 98 countries, including gas generators for hospital. We are dedicated to provide high quality products and excellent engineering work.

Here we selected some representative projects in main applications. You can find what you need in related industry and similar application, no matter in generators projects or in gas generators projects. When you receive our generators and see where they are located, you will find obviously excellence performance both in products and service.

After Sale Service
icon-efficient

Efficient

Design, manufacturing, quality and after-sales service all under PowerLink control

icon-Multi-user

Multi-user

PowerLink Project lifecycle management system eases your unit-monitoring without location limitation

icon-safe

Safety

PowerLink has successfully delivered around 125,000 generators into to users in 98 countries.

iconEnvironmental-protection

Environmental protection

Environment protection is PowerLink’s top priority

1.8MW BIOGAS CHP SYSTEM ENGINEERING PROJECT

1.8MW BIOGAS CHP SYSTEM ENGINEERING PROJECT

  • Location: China
  • Equipment: 3*CG600-BG Gas Genset
  • Electric output mode: Low voltage to grid
  • Field / fuel: Waste Centre / Waste Landfill Biogas
  • Total output power: 1.8MW
400KW NATURAL GAS POWER GENERATION PROJECT

400KW NATURAL GAS POWER GENERATION PROJECT

  • Location: Europe
  • Equipment: CG400-NG Natural Gas Genset
  • Electric output mode: Low voltage to grid
  • Field / fuel: Boiler House for residentials
  • Total output power: 400KWe/460kWt
250KW BIOGAS POWER GENERATION PROJECT

250KW BIOGAS POWER GENERATION PROJECT

  • Location: United Kingdom
  • Equipment: GXE250-BG
  • Electric output mode: Low voltage to grid
  • Field / fuel: Landfill Site / Biogas
  • Total output power: 250KWe
250KW NATURAL GAS COGENERATION HOTEL PROJECT

250KW NATURAL GAS COGENERATION HOTEL PROJECT

  • Location: Europe
  • Equipment: CG250S-NG Natural Gas Genset Soundproof
  • Electric output mode: Low voltage to grid
  • Field / fuel: Hotel
  • Total output power: 250KWe/330KWt
2MW BIOGAS POWER GENERATION PROJECT

2MW BIOGAS POWER GENERATION PROJECT

  • Location: China
  • Equipment: 2x CG1000S-BG Gas Generator Container
  • Electric output mode: Low voltage to grid
  • Field / fuel: Livestock Manure / Biogas
  • Total output power: 2MWel
75KW BIOGAS POWER GENERATION PROJECT

75KW BIOGAS POWER GENERATION PROJECT

  • Location: Brazil
  • Equipment: 1xGXC75C-BG Biogas Genset
  • Electric output mode: Low voltage to grid
  • Field / fuel: Agricultural And Animal Husbandry / Biogas
  • Total output power: 75KW
200KW BIOGAS POWER GENERATION PROJECT

200KW BIOGAS POWER GENERATION PROJECT

  • Location: Czech
  • Equipment: 1xGXC200S-BG
  • Electric output mode: Low voltage to grid
  • Field / fuel: Organic Wastewater / Biogas
  • Total output power: 200KWe
250KW NATURAL GAS CHP SYSTEM ENGINEERING PROJECT

250KW NATURAL GAS CHP SYSTEM ENGINEERING PROJECT

  • Location: UK
  • Equipment: GXC250C-NG
  • Electric output mode: Low voltage to grid
  • Field / fuel: UK Entertainment Garden/Natural Gas
  • Total output power: 250KWe
1.1MW BIOGAS CHP SYSTEM ENGINEERING PROJECT

1.1MW BIOGAS CHP SYSTEM ENGINEERING PROJECT

  • Location: Burkina Faso
  • Equipment: 1xCG1000S-BG, 1xCG100S-BG
  • Electric output mode: Low voltage to grid
  • Field / fuel: Low voltage to grid
  • Total output power: 1.1MWel
2MW NATURAL GAS POWER GENERATION PROJECT

2MW NATURAL GAS POWER GENERATION PROJECT

  • Location: China
  • Equipment: 2xCG1000S-NG Natural Gas Genset
  • Electric output mode: 10.5kV high voltage to grid
  • Field / fuel: Thermoelectric Steam Triple Supply / Natural Gas
  • Total output power: 2 MWel
520KW Biogas Cogeneration CHP project

520KW Biogas Cogeneration CHP project

  • Location: Asia
  • Equipment: CG520C-BG
  • Electric output mode: Low voltage to grid
  • Field / fuel: Pig Farm/Biogas
  • Total output power: 520KWe
200KW BIOGAS CHP SYSTEM ENGINEERING PROJECT

200KW BIOGAS CHP SYSTEM ENGINEERING PROJECT

  • Location: China
  • Equipment: GXC200S-BG Biogas
  • Electric output mode: Low voltage to grid
  • Field / fuel: Cow Dung / Biogas
  • Total output power: 200KWe
500KW  NATURAL GAD POWER GENERATION PROJECT

500KW NATURAL GAD POWER GENERATION PROJECT

  • Location: UK
  • Equipment: 2*GXE250C-NG
  • Electric output mode: Low voltage to grid
  • Field / fuel: Chapel/Natural Gas
  • Total output power: 500KWe
500KW BIOGAS POWER GENERATION PROJECT

500KW BIOGAS POWER GENERATION PROJECT

  • Location: China
  • Equipment: GXC500S-BG Biogas Generator
  • Electric output mode: Low voltage to grid
  • Field / fuel: Cow Dung / Biogas
  • Total output power: 500KWe
520KW NATURAL GAS POWER GENERATION PROJECT

520KW NATURAL GAS POWER GENERATION PROJECT

  • Location: South Korea
  • Equipment: GXC200S-NG
  • Electric output mode: Low voltage to grid
  • Field / fuel: Cow Factory / Natural Gas
  • Total output power: 520KWe
TGE600C-NG Compressed Natural Gas Gen-set

TGE600C-NG Compressed Natural Gas Gen-set

  • Location: Ghana
  • Equipment: TGE600C-NG
  • Electric output mode: Low voltage to grid
  • Field / fuel: Ghana Gas Station/Natural Gas
  • Total output power: 600KWe
250KW Landfill Gas Power Generation Project

250KW Landfill Gas Power Generation Project

  • Location: Europe
  • Equipment: GXE250-LFG
  • Electric output mode: low voltage to grid
  • Field / fuel: Waste center/ LFG
  • Total output power: 250KWe
2MW Biogas Power and Heat Cogeneration Project

2MW Biogas Power and Heat Cogeneration Project

  • Location: Asia
  • Equipment: CG500C-BG
  • Electric output mode: low voltage to grid
  • Field / fuel: Cow Farm/Biogas
  • Total output power: 2000KWe
200KW Natural Gas Cogeneration Project

200KW Natural Gas Cogeneration Project

  • Location: Europe
  • Equipment: GXC100S-NG
  • Electric output mode: low voltage to grid
  • Field / fuel: Hotel/Natural Gas
  • Total output power: 200KWe
200KW Biogas Cogeneration Project

200KW Biogas Cogeneration Project

  • Location: Asia
  • Equipment: GE200C-BG
  • Electric output mode: low voltage to grid
  • Field / fuel: Pig Farm/Biogas
  • Total output power: 200KWe
220KW Natural Gas  Generation Project

220KW Natural Gas Generation Project

  • Location: South America
  • Equipment: GXC220S-NG
  • Electric output mode: low voltage to grid
  • Field / fuel: Club/Natural Gas
  • Total output power: 220KWe
250KW Natural Gas Generation Project

250KW Natural Gas Generation Project

  • Location: Europe
  • Equipment: GXE250C-NG
  • Electric output mode: low voltage to grid
  • Field / fuel: Factory/Natural Gas
  • Total output power: 250KWe
200KW Biogas Power Generation Project

200KW Biogas Power Generation Project

  • Location: Europe
  • Equipment: GXE200MC-BG
  • Electric output mode: low voltage to grid
  • Field / fuel: Plastic Factory/Biogas
  • Total output power: 200KWe
100KW Biogas Power Cogeneration Project

100KW Biogas Power Cogeneration Project

  • Location: Asia
  • Equipment: GXC100S-BG
  • Electric output mode: low voltage to grid
  • Field / fuel: Agricultural Park/Biogas
  • Total output power: 100KWe
2MW Biogas Power Cogeneration Project

2MW Biogas Power Cogeneration Project

  • Location: Asia
  • Equipment: CG1000-BG
  • Electric output mode: low voltage to grid
  • Field / fuel: Cow Farm/Biogas
  • Total output power: 2000KWe
520KW Natural Gas Cogeneration Project

520KW Natural Gas Cogeneration Project

  • Location: Europe
  • Equipment: CG520C-NG
  • Electric output mode: low voltage to grid
  • Field / fuel: Power Plant/Natural Gas
  • Total output power: 520KWe
270KW Natural Gas Cogeneration Project

270KW Natural Gas Cogeneration Project

  • Location: Europe
  • Equipment: CG270C-NG
  • Electric output mode: low voltage to grid
  • Field / fuel: Power Plant/Natural Gas
  • Total output power: 270KWe
200KW Biogas Generation Project

200KW Biogas Generation Project

  • Location: Southeast Asia
  • Equipment: GXE200MC-BG
  • Electric output mode: low voltage to grid
  • Field / fuel: Power Plant/Biogas
  • Total output power: 200KWe
600KW Biogas Genset Project

600KW Biogas Genset Project

  • Location: Europe
  • Equipment: TGE600C-BG
  • Electric output mode: low voltage to grid
  • Field / fuel: Wastewater Factory/Biogas
  • Total output power: 600KWe

CONTACT US TODAY

Have any questions about our products, becoming a partner or how we can help with your gas projects?

Speak with our team today by pressing the link below.